Archive for the 'Community Interests' Category

Treeway Damage

May 24th, 2017

We are sad to report that since late April about 20 trees have been damaged on the Roy Clements Treeway  behind Mt Albert Grammar School. It started with cabbage trees and now includes manuka, mahoe and others, especially those between Lyon Ave and Alberton Ave. This is disturbing since the community has spent many hours planting these trees on this widely used boardwalk.

Help needed:  Anyone who has seen people loitering or has information about who has done this damage,

Please contact STEPS: contact@meolacreek.org.nz    Thanks – your help is appreciated.

21 May – Meola Planting 2017

May 4th, 2017

Join members of the St Lukes Environmental Protection Society (STEPS) for the community planting at Roy Clements Treeway, Meola Creek.  Come along with your family and friends for a couple of hours of planting and help improve the native biodiversity of the area.

When: Sunday 21 May 2017 at 10.30 am

Where: Kerr Taylor Reserve end of Treeway, 35 Fergusson Ave, Mt Albert

What to bring: Sunhat, sunblock, raincoat, water bottle, gardening gloves and a spade, if you have them.
IMG_6618_1500

For further information contact us via our website. If it rains, we will post

an update on the STEPS website. Thanks to Albert-Eden Local Board for its support.

AlbertEden LB logo

Mt Albert MP visits Meola

May 1st, 2017

On 27 April STEPS was delighted to host our new Mt Albert MP’s Jacinda Ardern’s visit to Meola Creek in the heart of Mt Albert electorate.

We spoke with Jacinda about the likely increases in storm water pollution due to more extreme weather events at the same time as the the planned “intensification” of Auckland isthmus under the Auckland Unitary Plan. We need housing plans that include funding for stormwater infrastructure so that people’s houses are not flooded, and our beaches not polluted.   See Jacinda’s post about Meola.

Jacinda Ardern

Background: Meola catchment has minimal or no storm water infrastructure;  there are some “combined sewers” where Auckland Council has ‘borrowed’ space from Watercare sewers. These ‘blow’ nearly every time it rains and our flood photos on this site show the results. Sadly Meola has the unenviable record of the highest volume of overflows of raw sewage and heavy metal runoff in Auckland.

STEPS is working closely with Watercare Services on the Central Interceptor.  By 2026 (yes 9 years’ time) it is intended to reduce Meola annual sewage overflows from around 100 to around 20 overflows. Without additional work on stormwater the large floods shown in our photo gallery will still occur, and toilet paper and pathogens will still be found on Auckland  beaches.

Watercare CEO in Asset Management plan 2016-36  states

  • Continued reliance  on  the  wastewater system for  the collection  and  treatment of stormwater is  not sustainable  for  a growing and liveable  city.” 

STEPS agrees and calls on Auckland Council to update the Three Waters Strategy, and arrange for long term funding of stormwater infrastructure on the isthmus. STEPS informed Jacinda that we believe Government support will be needed for infrastructure funding.

Put simply – we need an Auckland Isthmus stormwater plan, the funding, and an independent regulator who will ensure it is built.

We were pleased with this first visit, especially in the context that this was the week when the 2017 round of Freshwater submissions to Government occurred.

« Prev - Next »

%d